About the Author: Kathy Zagzebski is the President & Executive Director of the National Marine Life Center.

Extech Installation – Day 5

The last nine Extech panels were installed today, and the front facade is nearly complete!  Work continued with adding a frame around the edges to help hold the panels in place.  All that’s left are the doors, which were delivered at the end of the day.  Inside, you can see how much light the panels allow in.  The sunset at the end of the day was beautifully reflected.

Hospital 2009-10-30 015

The last panel!

Hospital 2009-10-30 020

Lifting the panel.

Hospital 2009-10-30 023

Adding the frame.

Hospital 2009-10-30 035

Frame detail.

From inside.

From inside.

Hospital 2009-10-30 113

Sunset.

Filed Under: ConstructionFeatured

Tags:

RSSComments (0)

Trackback URL

Leave a Reply

  • Site Menu
  • NMLC Blogs