We have walls!
Over the past week, the building skeleton has been filled in with exterior wall panels. Crews from H&S Construction are working hard to finish so we can open our new marine animal hospital by October 31st for sea turtle stranding season. It’s been wonderfully fun to see the building look more and more complete each day!
![hospital-2009-08-24-001 West wall, north end looking southward.](https://ezidesignconcept.com/wp-content/uploads/2009/09/hospital-2009-08-24-001-225x300.jpg)
![hospital-2009-08-24-021 West and south wall, viewed from the LSS building.](https://ezidesignconcept.com/wp-content/uploads/2009/09/hospital-2009-08-24-021-300x225.jpg)
![hospital-2009-08-24-007 Working on the east wall.](https://ezidesignconcept.com/wp-content/uploads/2009/09/hospital-2009-08-24-007-300x225.jpg)
![hospital-2009-09-02-019 Completed east wall, viewed from the south looking north.](https://ezidesignconcept.com/wp-content/uploads/2009/09/hospital-2009-09-02-019-300x225.jpg)
![hospital-2009-09-02-018 Completed south wall - we just need to install the roll-up garage door.](https://ezidesignconcept.com/wp-content/uploads/2009/09/hospital-2009-09-02-018-300x225.jpg)