Extech Installation – Day 3
Work progressed less dramatically today, although the crew still made great progress. They finished installing Extech panels up to the hospital mid-line, and then installed the exterior frame to help support the wall. Rain stopped us early, and is likely to prevent exterior work tomorrow.
![Hospital 2009-10-27 015 Hospital 2009-10-27 015](https://ezidesignconcept.com/wp-content/uploads/2009/10/Hospital-2009-10-27-015-300x225.jpg)
Michael, Ginette, Jo, and Mami from cosestudi stopped by to check the progress of the Extech installation.