Extech Installation – Day 2
Now that the crew has installed the first panels, the work proceeds more quickly. Richard, Mac, and Brian had five additional panels installed before I arrived at NMLC this morning! They proceeded to work their way towards the hospital’s mid-line. Along they way, they paused for some touch-up painting of the metal beams before installing the translucent Extech panels over the front. Even mom picked up a paint brush to help! By the end of the day, almost half of the building facade was in place.
![Hospital 2009-10-26 001 Hospital 2009-10-26 001](https://ezidesignconcept.com/wp-content/uploads/2009/10/Hospital-2009-10-26-001-225x300.jpg)
![Hospital 2009-10-26 011 Hospital 2009-10-26 011](https://ezidesignconcept.com/wp-content/uploads/2009/10/Hospital-2009-10-26-011-150x150.jpg)
![Hospital 2009-10-26 003 Brian painting](https://ezidesignconcept.com/wp-content/uploads/2009/10/Hospital-2009-10-26-003-150x150.jpg)
![Hospital 2009-10-26 013 Hospital 2009-10-26 013](https://ezidesignconcept.com/wp-content/uploads/2009/10/Hospital-2009-10-26-013-300x225.jpg)