Extech Installation – Day 3
Work progressed less dramatically today, although the crew still made great progress. They finished installing Extech panels up to the hospital mid-line, and then installed the exterior frame to help support the wall. Rain stopped us early, and is likely to prevent exterior work tomorrow.
Michael, Ginette, Jo, and Mami from cosestudi stopped by to check the progress of the Extech installation.