Extech Installation – Day 3

Work progressed less dramatically today, although the crew still made great progress.  They finished installing Extech panels up to the hospital mid-line, and then installed the exterior frame to help support the wall.  Rain stopped us early, and is likely to prevent exterior work tomorrow.

Hospital 2009-10-27 015
24 panels

Michael, Ginette, Jo, and Mami from cosestudi stopped by to check the progress of the Extech installation.